20 September 2024 | Energy and sustainability
Data centres have become a focal point in the UK's push toward digital infrastructure, earning their designation as Critical National Infrastructure (CNI) by the government. This strategic decision highlights the growing dependence on data centres to manage everything from cloud services to crucial sectors like healthcare and finance. Recognising their significance, the UK government aims to protect these facilities against cyberattacks following concerns about rising threats to CNI, especially from state actors like Russia and China.
Government Action and Investment Surge
The UK’s digital transformation aligns with increased investment in data centres. A prime example is the recent announcement of a £3.75 billion data centre in Hertfordshire, Europe's largest, designed to support the country’s expanding digital infrastructure. This marks one of the largest private sector investments in the UK’s data economy to date. This initiative is part of broader efforts to turn the UK into a hub for technological innovation, signalling confidence in the country’s potential to lead globally in the data industry.
Matthew Evans, director of markets at techUK, praised the designation of data centres as CNI, emphasising their role as drivers of economic growth and enablers of the UK's digital economy. The collaboration between government and the private sector is key to ensuring that the country’s data infrastructure can scale to meet future demands.
Labour’s Vision: Unlocking Economic Potential
The UK Labour Party has taken proactive steps to unlock the potential of data centres. In one of their early moves after winning a landslide in the general election, the Labour government reversed planning decisions that had previously halted the construction of data centres in Hertfordshire and Buckinghamshire. These reversals align with Labour’s vision of leveraging data centres as a crucial part of the nation’s economic infrastructure.
However, this ambition faces hurdles. Data centres are notorious for their high energy consumption, raising concerns about the sufficiency of the UK's current power grid to support this expansion. Labour’s data centre blitz is contingent on solving power shortages, which threaten to delay or limit new construction. As these facilities are highly energy-intensive, the strain on electricity supply could undermine the Labour government’s plans unless mitigated by sustainable energy initiatives.
The Energy Conundrum and Sustainability
The energy consumption of data centres presents an ongoing challenge. They require massive amounts of electricity, not only for the servers but for cooling systems to prevent overheating. As the UK grapples with energy supply issues, questions are being raised about whether the national grid can handle the added strain of large-scale data centres. If not, alternatives such as renewable energy or infrastructure upgrades will need to be explored. This is especially pressing as demand for data storage continues to surge, driven by the explosion of cloud computing, AI, and big data technologies.
Given these challenges, a balance between energy needs and sustainable solutions will be critical to ensuring the long-term viability of the UK’s data infrastructure. Moreover, the government’s push to make data centres greener by adopting more energy-efficient technologies and renewable power sources will be a key focus moving forward. Data centres in the UK are increasingly expected to adopt renewable energy practices, including solar, wind, and hydroelectric power, to mitigate environmental impacts while supporting the digital economy's expansion.
The Future of Data in the UK
As the UK solidifies its place as a global leader in digital infrastructure, data centres will play a central role in this transformation. Beyond being storage hubs, they are becoming the backbone of modern economic and public services. From secure online transactions to storing sensitive health data, data centres underpin critical services across industries, making them indispensable for the UK's economic future.
The government’s recognition of data centres as critical infrastructure is a crucial step in building the resilience needed to protect the country’s digital infrastructure. By working closely with private sector leaders and addressing energy challenges, the UK can maximise the potential of its burgeoning data economy while mitigating risks. With increased investment, technological advancements, and sustained government focus, the UK is well-positioned to be at the forefront of the global digital landscape for years to come.
The Third Annual Dementia Care Conference 2025
29 January 2025
Public Sector Estates and Facilities Management Show 2025
30 January 2025
The Northern Ireland Neurodiversity in the Workplace Conference 2025
5 February 2025
The National Information Management and Digital Construction Conference 2025
13 February 2025
The Third National Energy and Sustainability in the Public Sector Conference and Exhibition 2025
25 February 2025
Leaders in Energy – A Strategic Leadership Programme for the Energy Sector
14 January 2025
Agile Project Leadership Programme
21 January 2025
6 spaces available
Diversity, Inclusion, Equity, and Belonging for Leaders
28 January 2025
Women In Leadership
4 February 2025
Neurodiversity in the Workplace
5 February 2025
The web browser you are using to access this website is unsupported, which means certain aspects of the site wont work properly.
To use the website we recommend upgrading to a modern web browser such as Edge, Safari, Chrome, or Firefox if possible.